Built for shell contractors

Every pour break.
One living plan. Zero surprises.

Kastrak turns your structural drawings into a live pour map — trace the breaks, date them, and let the whole construction team see what pours next, what's blocked, and why.

Kastrak · live pour map
Four steps to a live plan

How Kastrak works

01
Step One

Upload your PDFs

Drop in your structural sheets, floor by floor.

S-2.00.pdf ✓
02
Step Two

Trace your pours

Outline each break with CAD-style snapping.

03
Step Three

Add the dates

Set a status and pour date on every zone.

JUN 2026
2345678 9101112131415 16171819202122
04
Done

Schedule & data built

The timeline builds itself — no spreadsheet.

LVL 27d cure
LVL 11,240 sf
FDNJun 12
S-2.00 · PARKING BASEMENT AND FOUNDATION PLAN
ABCDEF 123 N 1A Poured 7/9 1B Pours 8/6 1C Blocked · RFI
Trace Click each corner to trace the pour break right on the drawing.
Status Green = poured, amber = scheduled, red = blocked — at a glance.
Label chip Each zone carries its ID and pour date on a sticky-note chip.
Blocked Open RFIs and blockers flag the zone so nobody pours it early.
A-4.01 · BUILDING SECTION — POUR BREAK
0pours tracked per floor
0floors on a typical shell
0day cure watched per slab
0spreadsheets needed
Why Kastrak

Retire the sticky-note wall.

Every shell job has one — a paper plan furred with notes that peel, fade, and walk away. Kastrak keeps the same at-a-glance feel, minus the guesswork.

The old way
1B poured?? ask Ruben
1C — NO POUR rebar RFI!!
pump Tues 6am (maybe)
1A ✓ done 7/9??
call Frank re: 1D
  • Notes fall off, fade, or leave in someone's pocket
  • Only true the moment it was written
  • The field can't see it without driving to the trailer
With Kastrak
1A Poured 7/9 1B Pours 8/6 1C Blocked · RFI
  • Statuses live on the drawing, signed and time-stamped
  • Change a date once — everyone sees it instantly
  • Phone in the field, print for the wall when you want it
One markup, everyone

Mark it up once. The whole team has it.

Today a super marks up a PDF, screenshots it, and texts it around — and the next day half the crew is working off last week's version. Kastrak makes the plan itself the message.

  • Nothing gets lost. Clouds, arrows, dates and status live on the drawing — not buried in a text thread or a printout in someone's truck.
  • Distribute instantly. One link puts the marked-up plan in every phone and tablet the moment you change it.
  • One source of truth. No stale screenshots, no "which version is this" — everyone sees the same live plan.
S-2.00 · Marked up
1A
1B
RFI — rebar
RRuben · Super
FFrank · Foreman
PMOffice · PM
Schedule intelligence

The whole building, floor by floor, pour by pour.

A process timeline tracks each floor from first break to topped-out, with forming time between pours and a cure clock on every slab.

Foundation100% poured
Level 1100% poured
02Level 26 of 9 pours
03Level 3forming
04Level 4up next
Best features

Everything the trailer
argues about, answered.

Your command center. Every pour on one live plan.

1B · Pours 8/6

Upload your sheets — or let Kastrak place them for you.

01 02 03 04
Upload PDF
Auto-assign floor
Sheet library•••
+

Start a new pour

01 02 03 04
Trace pour break
Name this pour…
Next

Export what the trailer needs

One home for every floor

Stop tracking pours in someone's head.

Put the breaks on the drawing where the whole shell team can see them.